Schindler 9300 Advanced Edition Escalator

Configure your escalator plans in minutes

Schindler Plan makes it easy to create your escalator plans. Select the specifications and features from the fields below to configure a Model 9300AE escalator that fulfills your requirements. It’s easy and only takes a few minutes. For an in-depth analysis, choose “Let’s keep going” for detailed escalator dimensions, drawings, and BIM.

Plan View

Plan ViewX

Must select step width, step run, rise and seismic to view preview

Detailed Plan View

Detailed Plan ViewX

Must select step width, step run, rise and seismic to view preview

Section View

Section ViewX

Must select step width, step run, rise and seismic to view preview

Detailed Section View

Detailed Section ViewX

Must select step width, step run, rise and seismic to view preview

Print this Page


Basic Design Development

Application Will this escalator be for commercial (a mall for example) or heavy duty use (public transportation building for example).

ApplicationX

Will this escalator be for commercial (a mall for example) or heavy duty use (public transportation building for example).

Arrangement Single or parallel adjacent, criss-cross adjacent or parallel separate

ArrangementX

Single or parallel adjacent, criss-cross adjacent or parallel separate

Step Width This is how wide the steps are of the escalator.

Step WidthX

This is how wide the steps are of the escalator.

Step Run This is how many horizontal steps are at each landing.

Step RunX

This is how many horizontal steps are at each landing.

Speed The rate at which the escalator is moving.

SpeedX

The rate at which the escalator is moving.

Rise Floor to floor lower finish floor to upper finish floor height. (Minimum Rise is 6' 0", Maximum Rise is 55' 9 1/4")

RiseX

Floor to floor lower finish floor to upper finish floor height.

Power Supply What voltage will be available to power the escalator.

Power SupplyX

What voltage will be available to power the escalator.

Seismic Will the escalator be in an area defined as a seismic zone by code?

SeismicX

Will the escalator be in an area defined as a seismic zone by code?

Floors Served From Bottom most floor serving the escalator

Floors Served FromX

Bottom most floor serving the escalator

Floors Served To Top most floor serving the escalator

Floors Served ToX

Top most floor serving the escalator

High Traffic

High TrafficX

Finishes

Location Application Will the escalator be located indoors, outside but fully covered, or outside but uncovered

Location ApplicationX

Will the escalator be located indoors, outside but fully covered, or outside but uncovered

Balustrade Profile Design E, Design F, Design I (incline) - general external shape of the escalator above the step level. Design-E & F (Vertical panels), Design-I (Inclined away from passenger)

Balustrade ProfileX

Design E, Design F, Design I (incline) - general external shape of the escalator above the step level. Design-E & F (Vertical panels), Design-I (Inclined away from passenger)

Profile Finish Design E- Slimline stainless steel. Design-F - Powder coated extruded aluminum, Design-I (High-Deck stainless steel)

Profile FinishX

Design E- Slimline stainless steel. Design-F - Powder coated extruded aluminum, Design-I (High-Deck stainless steel)

Panel Finish Design-E (Glass), Design-F (Glass or Stainless), Design-I (Stainless)

Panel FinishX

Design-E (Glass), Design-F (Glass or Stainless), Design-I (Stainless)

Deck Finish Design-E&F (stainless, powder coated aluminum, custom color powder coat), Design-I (N/A)

Deck FinishX

Design-E&F (stainless, powder coated aluminum, custom color powder coat), Design-I (N/A)

Skirt Finish Sheet steel with black anti-friction, stainless steal with black, stainless with clear. Vertical surface with skirt brushes on it.

Skirt FinishX

Sheet steel with black anti-friction, stainless steal with black, stainless with clear. Vertical surface with skirt brushes on it.

Handrails Literally the handrails.

HandrailsX

Literally the handrails.

Joints Along Incline perpendicular to the incline or perpendicular to the finish floor

Joints Along InclineX

perpendicular to the incline or perpendicular to the finish floor

Truss Corrosion Protection All truss have single coat of factory applied truss finish paint. You can have a second coat. Or sandblast prime and finish. To prevent truss from getting rusty

Truss Corrosion ProtectionX

All truss have single coat of factory applied truss finish paint. You can have a second coat. Or sandblast prime and finish. To prevent truss from getting rusty

Additional Options

Combplate Lighting Light beside the combplate.

Combplate LightingX

Light beside the combplate.

Remote Controller Away from under truss.

Remote ControllerX

Away from under truss.

Feet from Upper Head Tells how far the controller is if remote. (Minimum Feet from Upper Head is 0, Maximum Feet from Upper Head is 0)

Feet from Upper HeadX

Tells how far the controller is if remote.

Smoke Sensors Smoke detectors.

Smoke SensorsX

Smoke detectors.

Skirt Lighting Lighting in skirt itself.

Skirt LightingX

Lighting in skirt itself.

Balustrade Lighting Lighting in balustrade.

Balustrade LightingX

Lighting in balustrade.

Truss Support Intermediate support in the middle of the truss (same as intermediate).

Truss SupportX

Intermediate support in the middle of the truss (same as intermediate).

Direction Indicators Visual indication of passenger travel. Stop sign or green arrow.

Direction IndicatorsX

Visual indication of passenger travel. Stop sign or green arrow.

Dirt Catch Trays Inside the truss at top and bottom landing. Where steps return it dumps contents into this.

Dirt Catch TraysX

Inside the truss at top and bottom landing. Where steps return it dumps contents into this.

Step Color The visible color of the step.

Step ColorX

The visible color of the step.

Step Band Heating Heaters inside the truss between the moving steps.

Step Band HeatingX

Heaters inside the truss between the moving steps.

Combplate Heating Heating inside combplate preventing ice formation on the complate and floorplate.

Combplate HeatingX

Heating inside combplate preventing ice formation on the complate and floorplate.

Pit Heater Heating inside the top & bottom truss truss sections. Warms controller, gearbox, lubrication and prevents ice formation on the floorplates.

Pit HeaterX

Heating inside the top & bottom truss truss sections. Warms controller, gearbox, lubrication and prevents ice formation on the floorplates.

Automatic Lubrication Lubrication moving components.

Automatic LubricationX

Lubrication moving components.

Electrical Equipment IP54 Enclosure rating that acceptable for outdoor installation.

Electrical Equipment IP54X

Enclosure rating that acceptable for outdoor installation.

Oil/Water Separater Additional option that separates trash and oil from rain water, lets water escape and captures trash to keep from going into water.

Oil/Water SeparaterX

Additional option that separates trash and oil from rain water, lets water escape and captures trash to keep from going into water.

Emergency Options

Smoke Detector Smoke detectors can be installed and when the smoke detector is actuated, the escalator is switched off.

Smoke DetectorX

Smoke detectors can be installed and when the smoke detector is actuated, the escalator is switched off.

Seismic Controller Wiring In areas that are seismic prone = switch senses ground motion sand if reaches a certain point will stop.

Seismic Controller WiringX

In areas that are seismic prone = switch senses ground motion sand if reaches a certain point will stop.

Maintenance Options

Regular Maintenance Standard service that is performed during regular business hours.

Regular MaintenanceX

Standard service that is performed during regular business hours.

Callback Service Emergency shutdown service that is performed 24/7.

Callback ServiceX

Emergency shutdown service that is performed 24/7.

Maintenance Period The duration in months of the initial after construction service period.

Maintenance PeriodX

The duration in months of the initial after construction service period.