Schindler 3300*
Schindler 3300*
CA, MA, WA, NYC and VT require elevator control rooms, please contact your local Schindler representative for options.
For jurisdictions following ASME A17.1 code prior to 2009, please add 1 additional inch of overhead at 150 FPM.
Capacity CapacityX
The amount of weight an elevator can safely carry.
|
2100 |
2500 |
3000 |
3500 |
---|---|---|---|---|
Speed SpeedX
The top speed the elevator can achieve in feet per minute.
|
100 150 |
100 150 |
100 150 |
100 150 |
Door Type Door TypeX
The number of door panels and the way they open.
|
2SSO |
2SSO SSCO |
2SSO SSCO |
2SSO SSCO |
Number of Stops Max Number of Stops MaxX
Amount of times the elevator can stop on a floor.
|
10 |
10 |
10 |
10 |
Available Entrances Max Available Entrances MaxX
Number of openings the elevator can have.
|
15 |
15 |
15 |
15 |
Travel Height Max Travel Height MaxX
Maximum distance the elevator can travel from the bottom landing to the top most landing served.
|
100 fpm708 150 fpm1181 |
100 fpm708 150 fpm1181 |
100 fpm708 150 fpm1181 |
100 fpm708 150 fpm1181 |
69.3125 |
81.3125 |
81.3125 |
81.3125 |
|
52.875 |
52.875 |
58.875 |
66.875 |
|
Inside Cab Height Inside Cab HeightX![]() |
93 |
93 |
93 |
93 |
Door Width Door WidthX![]() |
36 |
42 |
42 |
42 |
Passenger Max Passenger MaxX
The maximum number of people the elevator can hold.
|
13 |
15 |
18 |
21 |
Door Height Door HeightX![]() |
84 |
84 |
84 |
84 |
Hoistway Width Hoistway WidthX![]() |
Front OpeningsNo In Seismic Zone?90 Rear OpeningsNo In Seismic Zone?90 Front OpeningsYes In Seismic Zone?92 Rear OpeningsYes In Seismic Zone?92 |
Front OpeningsNo In Seismic Zone?102 Rear OpeningsNo In Seismic Zone?102 Front OpeningsYes In Seismic Zone?104 Rear OpeningsYes In Seismic Zone?104 |
Front OpeningsNo In Seismic Zone?102 Rear OpeningsNo In Seismic Zone?102 Front OpeningsYes In Seismic Zone?104 Rear OpeningsYes In Seismic Zone?104 |
Front OpeningsNo In Seismic Zone?102 Rear OpeningsNo In Seismic Zone?102 Front OpeningsYes In Seismic Zone?104 Rear OpeningsYes In Seismic Zone?104 |
Hoistway Depth Hoistway DepthX![]() |
Front Openings69 Rear Openings77.625 |
Front Openings69 Rear Openings77.625 |
Front Openings75 Rear Openings83.625 |
Front Openings83 Rear Openings91.625 |
Pit Depth Pit DepthX![]() |
60 |
60 |
60 |
60 |
Overhead OverheadX![]() |
151 |
151 |
151 |
151 |
Notes
- 2SSO doors available with right or left opening.
- Duplex operation available.
- Areas in seismic zone 2 or greater may require up to 3 1/2” more hoistway width. Please contact your Schindler Sales Representative for details and options.
- Clear overhead is defined from the lowest point below any obstruction such as: hoist beam(s), building beams, or roof structure to floor of top landing.
- Where permitted by code, no control closet is required. A 3-phase disconnect must be located in both the hoistway overhead and a location in the building outside of the hoistway. 110v disconnect should be located outside of hoistway. Disconnects are not required to be an elevator-dedicated space. Please confirm with local requirements.
- Travel height max. varies depending on speed (FPM) and capacity (lbs).
- Schindler recommends 8’-6” (2500 – 3500 lbs) and 7’-6” (2100 lbs), providing additional hoistway tolerances.
- Please contact your Schindler Sales Representative for options less than 5’-0.
- Please contact your Schindler Sales Representative for additional hatch options such as diagonal entrances.
- All dimensions are for information only and cannot be used for construction purposes without Schindler confirmation.
- The Schindler 3300 does not require a space-consuming machine room or control closet. However, some jurisdictions still require such space. In those areas please contact your local Schindler sales representative for a room or closet solution.