Will the escalator be in an area defined as a seismic zone by code?
Archives
Rise
Floor to floor lower finish floor to upper finish floor height.
Step Run
This is how many horizontal steps are at each landing.
Arrangement
Single or parallel adjacent, criss-cross adjacent or parallel separate
Application
Will this escalator be for commercial (a mall for example) or heavy duty use (public transportation building for example).
Model Number
Escalator Type
Edge to Edge Support
Overall length of wellway.
Maximum Rise
Height measured from lower finish floor to upper finish floor.
Pit Length
Measured from the front to the back of the pit.